Instructions for Mounting #651 Stabilizer
Open the original PDF document
View PDFInstallation Instructions
651 Stabilizers
- 1. On the inside door face, mark screw hole locations as shown.
- 2. Metal door: Drill and tap (2) #10-24 holes per stabilizer block. Wood door: Pre-drill for (2) #10 wood screws per stabilizer block.
- 3. Metal door: Attach each stabilizer block using (2) #10-24 x ¾" Oval Head machine screws provided. Wood Door: Attach each stabilizer block using (2) #10 x 1" Oval Head wood screws provided.
| Item | Part No. | Description | Qty | Sellable |
|---|---|---|---|---|
| 1 | 98-2555 | Mullion, 8' | 1 | No |
| 98-2566 | Mullion, 10' | No | ||
| 2 | 94-2050 | Top Retainer Pack 1,2 | 1 | Yes |
| 3 | 94-2051 | Bottom Retainer Pack 1,2 | 1 | Yes |
| 4 | 658 | Strike Pack | 1 | Yes |
| 5 | 651 | Stabilizer Block 3 | 1 | Yes |
- 1. Retainer packs contain mounting fasteners.
- 2. Specify finish.
- 3. Mounts to the door.
This product can expose you to lead which is known to the state of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65warnings.ca.gov.