651 Stabilizers Installation Instructions

Open the original PDF document

View PDF

Installation Instructions

651 Stabilizers

  • 1. On the inside door face, mark screw hole locations as shown.
  • 2. Metal door: Drill and tap (2) #10-24 holes per stabilizer block. Wood door: Pre-drill for (2) #10 wood screws per stabilizer block.
  • 3. Metal door: Attach each stabilizer block using (2) #10-24 x ¾" Oval Head machine screws provided. Wood Door: Attach each stabilizer block using (2) #10 x 1" Oval Head wood screws provided.

Item Part No. Description Qty Sellable
1 98-2555 Mullion, 8' 1 No
98-2566 Mullion, 10' No
2 94-2050 Top Retainer Pack 1,2 1 Yes
3 94-2051 Bottom Retainer Pack 1,2 1 Yes
4 658 Strike Pack 1 Yes
5 651 Stabilizer Block 3 1 Yes

  • 1. Retainer packs contain mounting fasteners.
  • 2. Specify finish.
  • 3. Mounts to the door.

This product can expose you to lead which is known to the state of California to cause cancer and birth defects or other reproductive harm. For more information go to www.P65warnings.ca.gov.